x

An integrated approach to
fitness club establishment:

  • Production Documentation
  • Design Project
  • Expert Support
READ MORE
RU EN

Lime fitness

Club for the whole family, the club area is more than 5000 square meters. Look more

Janin Fitness

The main difference: 600 square meters multifunctional gym with the most modern sports equipment Look more

SV SPA

Beauty salon Look more

Citrus

The first world-class sports and recreation complex in Chelyabinsk Look more

100%

The atmosphere of 100% fitness-club is nice, friendly, athletic and creative Look more

Style Gi

This club demonstrates an eco-friendly approach to the lifestyle in general and to the fitness in particular Look more

Contact Us

7 (903) 793-63-61
8 (985) 774-40-57
info@labseventeen.com

About the company

Our chief ideologist, Sergei Ryabov, is the Director and Principal Architect of LAB17. He has 15 years of experience in this field. Over the past decade, we have built around 100,000 square meters of athletic space.   More than 100 000 customers were introduced to a healthy ...
Read more

Services

Bringing in a Design Company for Engineering Section

Experience has shown that it is more efficient to engage a general contractor to implement the Engineering Solution. This avoids “finger-pointing", which frequently happens in the case, when different stages of design are performed by independent companies.
Read more

Services

Reconciliation and final Production Documentation

At the stage of development when Engineering Studies are completed, various fitness specifics issues are also monitored and discussed.
Read more

Services

Engaging a Management Company

To determine the organizational structure of the club, we bring in our partners - a Moscow based Business Management Company that will either take over the organization of preliminary sales or will train the local managers.
Read more

Services

Development of the Design Project

A full working project includes a Construction Drawing Set including materials, fixtures, appliances, as well as engineering and technological details. Depending on the size and content of the facility, the development of the project takes 4 to 6 months. The Design Projected is completed upon...
Read more

Services

Expert support to ensure the integrity of the design

Upon request, we provide expert support to enforce the integrity of the design and to deal with clarifications and administer revisions. Time and number of site visits are determined separately.
Read more

Services

echnical and informational control over the implementation of the Design Project

Construction oversight is also available with the following options: logistical support, material sourcing, performance evaluation and inspection of contractors.
Read more

Services

Schematic Design and Site Considerations

The Design Concept is implemented as floor plans and elevations detailing the proposed features and the footage for each room. Initially a schematic, conceptual sketch of the floor plans is prepared for further discussion and reevaluation of appropriate functions. Those are further refined and...
Read more

Services

Bringing in a Design Company to implement the Engineering and the Architectural solutions

At this stage in the project, we employ a partner firm: a Moscow based Design Company, which has extensive experience in designing fitness oriented projects.
Read more

Services

Expert support and protecting the integrity of the Design Concept

We provide expert support to enforce the integrity of the design and to deal with clarifications and administer revisions, if necessary. The final Design Concept for the facility is presented to the designers in the form of a Preliminary Drawing Set and Material Studies. When the working...
Read more

Services

Preparing Design Specifications for Technological Studies

Preparation of the project documentation breakdown according to engineering specialties. We draw up tables and give out the Design Specifications.
Read more

Services

Site Analysis and initial Programming

All the necessary materials regarding the projected construction site should be gathered, the building footprint should be determined, footage and the number of storeys of the proposed object should be estimated. In addition, the relevant building and planning codes should be clarified, as well...
Read more

Services

Determination of the Design Requirements for the proposed facility

At the initial stage, the design Program should be formulated for the Engineering and the Architecture groups. This Program is later used as the document of reference in the development of the proposed facility. This is an important and intricate job, which takes time and patience.
Read more

Our projects

Our partners